Geological Literature
Using the Pipe Roof Method to Excavate Directly Under a Golf Course with a Minimum Covering of 3m - The National Route 1, the Hokusei Bypass, the Third Phase of the Sakabe Tunnel Project -
Masakatsu Komiya
| item | description |
|---|---|
| Title | Using the Pipe Roof Method to Excavate Directly Under a Golf Course with a Minimum Covering of 3m - The National Route 1, the Hokusei Bypass, the Third Phase of the Sakabe Tunnel Project - |
| Authors | Masakatsu Komiya |
| Data name | Tunnels and Underground |
| Volume | 55 |
| Num | 11 |
| Page | 915-926 |
| Year | 2024 |
| Publisher | Doboku Kougakusha |
| Language | JA |
| Abstract language | EN |
| ISSN | 0285631X |
| GEOLIS URL | https://darc.gsj.jp/archives/detail?cls=geolis&pkey=300040682 |
| @id | https://gbank.gsj.jp/ld/resource/geolis/300040682 |